Description
Suspension was sanded down to the metal or sand blasted. epoxy primered and painted. all new suspension components were replaced all rubber bushings, struts brakes, rotors.wheel bearings, wheel studs, calipers were replaced with oem nisan remanufactured part. the rear end was taken apart inspected and new seals were installed. the gas tank was restored along with a new filler neck and fuel lines and a fuel pump. the rack n pinion was taken apart re greased and new…
Suspension was sanded down to the metal or sand blasted. epoxy primered and painted. all new suspension components were replaced all rubber bushings, struts brakes, rotors.wheel bearings, wheel studs, calipers were replaced with oem nisan remanufactured part. the rear end was taken apart inspected and new seals were installed. the gas tank was restored along with a new filler neck and fuel lines and a fuel pump. the rack n pinion was taken apart re greased and new tie rods were installed. along with new bellows boots. the motor was rebuilt using new pistons, piston rings, bearings. oil pump, seals. the cylinder head. new valves, valve seats, valve springs. along with a valve job.